Selected work and the thinking behind it

Three projects that show the whole range: research, systems design, and shipping the production code. Each one names the problem, the approach and the measured result.

Ask about a specific project
Case study 01Content Ops
Enterprise content publishing workflow on screen

Wells Fargo Publishing Modernization

18 months / enterprise web platforms

Publishing turnaround

50% FASTER

Sites governed

250+ SITES

Training videos produced

300+ VIDEOS

Read the breakdown
TJ Kleven reviewing documentation between notebook and laptop
Helio Design System interface

Design engineer, lead

Helio Design System

Problem
Four squads shipped four different button components and a two-week QA tail.
Approach
Audited 300 screens, defined tokens, then built and documented the library in React.
Result
38% faster feature builds and 112 legacy components deleted.
Northgate Logistics interface

Senior product designer

Northgate Logistics

Problem
Dispatchers ran the yard on a spreadsheet beside an unusable legacy console.
Approach
Shadowed three shifts, mapped the real decision sequence, prototyped in the browser.
Result
Support tickets cut in half; onboarding for new dispatchers dropped to one day.
Ledgerloop interface

Founding designer

Ledgerloop

Problem
Finance teams abandoned reconciliation halfway through because errors were invisible.
Approach
Designed a diff-first review flow and shipped it end to end with two engineers.
Result
First enterprise contract signed off the back of the demo.
Prototype printouts across a dim studio desk
Hire TJ
for the next build

Full case-study decks, code samples and references are shared on request — tell me the role and I will send what is relevant.

Request the deck →
TJ Kleven © 2026Minneapolis, USA